[edit] Introduction
The first set of national building standards was introduced in 1965. Now known as the Building Regulations, they set out:
- What qualifies as ‘building work’ and so falls under the control of the regulations.
- What types of buildings are exempt (such as temporary buildings).
- The notification procedures that must be followed when starting, carrying out, and completing building work.
- Requirements for specific aspects of building design and construction.
If you do not follow the building control procedures set out for handling your building work or you carry out building work which does not comply with the requirements contained in the building regulations, you will have contravened the regulations.
[edit] Prosecution and enforcement notices
A local authority has a general duty to enforce the building regulations in its area and will seek to do so by informal means wherever possible. If informal enforcement does not achieve compliance with the regulations the local authority has two formal enforcement powers which it may use in appropriate cases.
- If a person carrying out building work contravenes the Building Regulations, the local authority may prosecute them in the Magistrates' Court where an unlimited fine may be imposed (sections 35 and 35A of the Building Act 1984). Prosecution is possible up to two years after the completion of the offending work. This action will usually be taken against the person carrying out the work (builder, installer or main contractor).
- Alternatively, or in addition, the local authority may serve an enforcement notice on the building owner requiring alteration or removal of work which contravenes the regulations (section 36 of the 1984 Act). If the owner does not comply with the notice the local authority has the power to undertake the work itself and recover the costs of doing so from the owner.
A section 36 enforcement notice cannot be served on after the expiration of 12 months from the date of completion of the building work. A local authority also cannot take enforcement action under section 36 if the work is in accordance with a full plans application which the authority approved or failed to reject.
An appeal against a section 36 notice may be made to a Magistrates’ Court under section 102 of the Building Act.
Where an approved inspector is providing the building control service, the responsibility for checking that the building regulations are complied with during the course of building work will lie with that inspector. They will usually do this by advising you.
However, approved inspectors do not have formal enforcement powers. In a situation where the inspector considers building work does not comply with the building regulations and there is a refusal to bring it into compliance the inspector will cancel the initial notice. If no other approved inspector takes on the work, the building control function will automatically be taken on by the local authority. From this point on, the local authority will have the enforcement powers set out above.
[edit] Impact on selling a property
Notwithstanding the possibility of enforcement action, if the local authority or approved inspector considers that building work carried out does not comply with the building regulations and it is not rectified, no completion/final certificate will be issued and this is likely to come to light through a local land search enquiry during the sale of a property.
[edit] Related articles on Designing Buildings Wiki
- Approved documents.
- Approved inspector.
- Building codes.
- Building control body.
- Building notice.
- Building regulations.
- Building regulations completion certificate.
- Building regulations inspection.
- Dangerous buildings.
- Do the building regulations apply to existing buildings?
- Full plans.
- How long it takes to get building regulations approval and how long it lasts.
- Planning permission.
- Regularisation.
- Statutory approvals.
- Statutory authorities.
- The Building Act.
- The difference between planning permission building regulations approval.
- What approvals are needed before construction begins.
Featured articles and news
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA has launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments
What impact does failing to have Building Regs signed off on a rented flat? In this scenario the built project also differs from the submitted and approved planning drawings (won on appeal). What happens to the tenants?
The flat was built just over a year ago. Any help would be appreciated, the landlord is unresponsive on all fronts and very negligent. The flat is oddly very nicely finished and would not raise alarm bells.